+++ 2019 +++

Design Standards

PW Header

Engineering Design Standards

The City of Astoria Engineering Design Standards were originally adopted in December 2015 (via Resolution No. 15-30) and revised in August 2017. The Engineering Designs Standards are intended to facilitate the planning, design and implementation of public infrastructure. In addition to these standards, design consultants and engineers must comply with appropriate state and federal codes, safety regulations, environmental requirements and other applicable regulations. To request AutoCAD files or with any other questions, please contact the Engineering Division.


Engineering Design Standards

The City of Astoria Engineering Design Standards may be viewed, downloaded and/or printed by visiting the following link: Engineering Design Standards (August 2017)


Standard Specifications

The City of Astoria utilizes the Oregon Standard Specifications for Construction with Astoria Standard Special Provisions.


Standard Details

 Street Details
Detail Detail Description Date File 
ST-1Street Cross Section Detail11/20/2015 PDF
ST-2Typical Street Width Detail07/24/2014PDF
ST-3Sidewalk Detail06/20/2018PDF
ST-4Curb Detail11/01/2012PDF
ST-5Driveway Apron Detail11/10/2015PDF
ST-6Curb Return Driveway Detail11/10/2015PDF
ST-7Cul-de-Sac Detail11/01/2012PDF
ST-8Hammerhead Detail11/01/2012PDF
ST-9Curb Rain Drain Detail11/13/2015PDF
UT-1Utility Trench Detail11/20/2015PDF


 Water Details
Detail Detail Description Date File 
W-1Water Valve Detail08/04/2023PDF
W-2Fire Hydrant Detail08/07/2023PDF
W-33/4-inch & 1-inch Water Service Detail08/07/2023PDF
W-42-inch Water Service Detail08/07/2023PDF
W-53- to 10-inch Water Service Detail08/07/2023PDF
W-6Blow Off Detail08/07/2023PDF
W-7Air/Vacuum Release Valve Detail08/07/2023PDF

 

 Sanitary Sewer Details
Detail Detail Description Date File 
S-1Manhole Frame & Cover Detail09/11/2017PDF
S-2Precast Manhole Base Detail09/11/2017PDF
S-3Standard Manhole Detail11/20/2015PDF
S-4Flat Top Manhole Detail11/16/2015PDF
S-5Manhole Over Existing Sewer Detail11/15/2012PDF
S-6Outside Drop Connection Detail11/01/2012PDF
S-7Inside Drop Connection Detail10/06/2014PDF
S-8Typical Sewer Connection Detail01/09/2017PDF
S-9Clean Out Detail09/11/2017PDF

 

 Storm Drain Details
Detail Detail Description Date File 
SD-1Catch Basin Frame & Grate Detail09/11/2017PDF
SD-2Field Inlet Detail11/01/2012PDF
SD-3Catch Basin Detail11/01/2012PDF
SD-4Catch Basin Detail - Section A09/11/2017PDF
SD-5Catch Basin Detail - Section B09/11/2017PDF