11th Street CSO Separation Project



Sign Up for Project Updates

Full Name

Email Address

11th Street CSO Separation Project

The 11th St CSO Separation project consists of installing over 10,000 feet of new stormwater pipe. It will be necessary to replace existing water and sanitary sewer pipe where construction of the new storm pipe compromises the integrity of these existing pipes. Due to the extent of utility replacement work along 8th St, the entire roadway will be rebuilt from curb to curb and most of the sidewalk replaced.  

PROJECT UPDATE 03-21-14