11th Street CSO Separation Project
The 11th St CSO Separation project consists of installing over 10,000 feet of new stormwater pipe. It will be necessary to replace existing water and sanitary sewer pipe where construction of the new storm pipe compromises the integrity of these existing pipes. Due to the extent of utility replacement work along 8th St, the entire roadway will be rebuilt from curb to curb and most of the sidewalk replaced.
PROJECT UPDATE 03-21-14
11th ST CSO Project Map
11th ST CSO PowerPoint Presentation